If 6 men and 8 boys can do a piece of work in 10 days while 26 men and 48 boys can do the same work in 2 days, then what is the time taken by 15 men and 20 boys to complete the same type of work?
Question and options
If 6 men and 8 boys can do a piece of work in 10 days while 26 men and 48 boys can do the same work in 2 days, then what is the time taken by 15 men and 20 boys to complete the same type of work?
- 4 days
- 5 days
- 6 days
- 7 days
Answer and explanation
Correct answer: A - 4 days
Let one man do and one boy per day: and . Multiplying the first by 6 gives ; subtracting, , , then . per day, so 4 days.
Practice for these exams
-
CUSAT CAT LLM
Related question papers
Related exam syllabi
More solved explanations in Arithmetic
- If the radius of each of four outer circles is \(r\), then the radius of the innermost circle is
- The product of two numbers is 1320 and their HCF is 6. The LCM of the numbers is
- When 2½ is added to a number and the sum is multiplied by 4½, and then 3 is added to the product and then the sum is divided by 1⅕, the quotient becomes 25. What…
- The probabilities that A, B, and D can solve a problem independently are 1/3, 1/3, and 1/4 respectively. The probability that only two of them are able to solve…
- A ball of silver 4 cm in diameter is covered with gold. If the volume of the gold and silver are equal, then the thickness of gold is :