Sahil can complete a job in 20 days when working alone. Manoj is twice as fast as Sahil and three times as fast as Ashish in the same job. The collaborative work arrangement involves Sahil and Manoj…
Question and options
Sahil can complete a job in 20 days when working alone. Manoj is twice as fast as Sahil and three times as fast as Ashish in the same job. The collaborative work arrangement involves Sahil and Manoj working on the first day, Sahil and Ashish on the second day, and Manoj and Ashish on the third day. This three-day cycle continues till the work is complete.
What fraction of the total work will then be done by Ashish till the job is completed?
What fraction of the total work will then be done by Ashish till the job is completed?
Answer and explanation
Correct answer: A - \(\frac{7}{40}\)
Rates per day in units of 1/60 of the work: Sahil 3, Manoj 6, Ashish 2. Days S+M = 9, S+A = 5, M+A = 8, so a cycle does 22. Two cycles = 44 (Ashish 8); day 7 S+M -> 53; day 8 S+A -> 58 (Ashish +2); day 9 M+A needs 2 of 8, i.e. 1/4 day (Ashish +0.5). Ashish's total = 10.5/60 = 7/40.
Practice for these exams
-
IIM Bangalore BBA DBE Entrance Test
Related question papers
Related exam syllabi
More solved explanations in Arithmetic
- Arrange the following in descending order based on their perimeters: I. A square with an area of 36 sq. cm. II. An equilateral triangle with a side of 9 cm. III. A…
- A population of a country is 90 crores. If it increases by 2% in first year and 10% in second year, then what will be the population after second year?
- A train 600 meters long is running at a speed of 90 kms/hr. If it crosses a tunnel in one minute, then the length of the tunnel is:
- If the difference between 62% and 80% of a number is 198, then the difference between 92% and 56% of the same number will be :-
- In a mixture of 60 litres, the ratio of milk and water is 5 : 3. In order to make this ratio 1 : 2, the quantity of water to be added to the mixture is