Question 1
Match List-I and List-II and select the correct answer:
| List-I | List-II |
|---|---|
| P. Waterfall model | 1. Specifications can be developed incrementally |
| Q. Evolutionary model | 2. Requirements compromises are inevitable |
| R. Component-based software engineering | 3. Explicit recognition of risk |
| S. Spiral development | 4. Inflexible partitioning of the project into stages |
Question 2
Which one of the following is True?
Question 3
A company needs to develop a strategy for software product development for which it has a choice of two programming languages L1 and L2. The number of Lines Of Code (LOC) developed using L2 is estimated to be twice the LOC developed with L1, and the product will have to be maintained for five years. Various parameters for the company are given in the table below.
| Parameter | Language L1 | Language L2 |
|---|---|---|
| Man years needed for development | LOC/10000 | LOC/10000 |
| Development cost per year | Rs. 10,00,000 | Rs. 7,50,000 |
| Maintenance time | 5 years | 5 years |
| Cost of maintenance per year | Rs. 1,00,000 | Rs. 50,000 |
Total cost of the project includes cost of development and maintenance. What is the LOC for L1 for which the cost of the project using L1 is equal to the cost of the project using L2?
Question 4
A company needs to develop digital signal processing software for one of its newest inventions. The software is expected to have 40,000 lines of code. The company needs to determine the effort in person-months needed to develop this software using the basic COCOMO model.
The multiplicative factor for this model is given as 2.8 for software development on embedded systems, while the exponentiation factor is given as 1.20. What is the estimated effort in person-months, approximately?
Question 5
Which of the following is not desired in a good Software Requirement Specifications (SRS) document?
Question 6
What is the appropriate pairing of items in the two columns listing various activities encountered in a software life cycle?
| List-I | List-II |
|---|---|
| P. Requirement capture | 1. Module development and integration |
| Q. Design | 2. Domain analysis |
| R. Implementation | 3. Behavioural modelling |
| S. Maintenance | 4. Performance tuning |
Question 7
Arrange the following phases of the Software Development Life Cycle in order:
I. Maintenance
II. Testing
III. Design
IV. Deployment
V. Gathering Requirements and Analysis
VI. Project Planning
VII. Coding or Implementation
Question 8
Which of the following statements are True?
I. The context diagram should depict the system as a single bubble.
II. External entities should be identified clearly at all levels of DFDs
III. Control information should not be represented in a DFD
IV. A data store can be connected either to another data store or to an external entity
Question 9
A process which defines a series of tasks that have the following four primary objectives is known as:
- To identify all items that collectively define the software configuration
- To manage changes to one or more of these items
- To facilitate the construction of different versions of an application
- To ensure that software quality is maintained as the configuration evolves over time.
Question 10
Equivalence partitioning is a __________ method that divides the input domain of a program into classes of data from which test cases can be derived.